Behr Trout dough (long leader)

Behr
Behr Trout dough (long leader)
Behr Trout dough (long leader)
Behr
Hook Size
Length cm
Trace Ø mm
Contents
4
120
0.25
5
237966.85.585
Hook Size Length cm Trace Ø mm Contents Order No. Now only  Avail. Quantity
4
120
0.25
5
237966
1,59
Available
6
120
0.22
5
237967
1,59
Available
8
120
0.20
5
237968
1,59
Available
Behr Trout dough (long leader)
Special leader hook for fishing for trout with dough. Contents: 5 pieces.
Recommendation
Models

Manufacturer Information:

Brandname: Behr
Address: Am Sägewerk 3, 68526 Ladenburg
E-Mail: info@behrfishing.de